About Colombia Staking

Real Servers. Real Solar.
Real Accountability.

Professional validator infrastructure powering the MultiversX network with reliability, security, and 100% green energy

48 Nodes
840+ Delegators
100% Uptime
100% Green Energy
How It's Built

From Sunlight to Settlement

Every transaction our validators sign traces back to the same source — here's the chain that powers it

Power Source
5.75 kW Solar

Every server runs on renewable energy, with a 12-hour battery bank carrying the load after sunset.

Compute
4 Machines · 32 Cores

Bare-metal validator hardware in Colombia — no shared virtualization, no noisy neighbors.

Connectivity
3 Redundant Links

Fiber, Starlink and backup ISP load-balanced across three connections, so one outage never takes a validator offline.

Infrastructure — Colombia

Solar-powered validator site: three live shard hosts plus a full local backup

Shard 0 + Metachain Validator
CPU
i5-10400
Cores
6 @ 2.9GHz
RAM
16 GB
Type
Bare Metal
Shard 1 Validator
CPU
i7-10700
Cores
8 @ 2.9GHz
RAM
16 GB
Type
Bare Metal
Shard 2 Validator
CPU
i5-10400
Cores
6 @ 2.9GHz
RAM
16 GB
Type
Bare Metal
Backup S0 / S1 / S2 / Meta
CPU
i5-12600H
Cores
12 @ 4.5GHz
RAM
24 GB
Type
Bare Metal
Why It Holds Up

Built to Never Miss a Block

5.75 kW of solar power keeps every validator running on 100% renewable, carbon-free energy — every epoch, every day.

12 hours of battery backup means a power outage never takes your stake offline, day or night.

Dual ISP failover — Fiber (900 Mbps) and Starlink (250 Mbps) load-balanced for zero downtime if either connection drops.

Automatic climate control keeps hardware cool through peak heat, powered by the same solar system that runs the validators.

24/7 real-time monitoring with instant alerts means automatic failover the moment anything changes.

Bare metal only — dedicated physical servers, no virtualization, for maximum security and performance.